Replacement of Hydrants
|
Perform replacement of hydrants throughout the distribution system.
|
Distribution |
7/27/2022 |
12/31/2024 |
$11,535,460.00 |
100% |
92% |
Furnish and Install Valves, Hydrants, Curb Stops, Service Lines, Restoration |
Replace valves, hydrants, curb stops, service lines, and make water main improvements.
|
Distribution |
7/8/2020 |
12/31/2024 |
$8,048,770.00 |
100% |
100% |
Water Transmission Main Improvement to the Industrial Loop - Advanced Work to Levine Tanks Contract |
Advanced work to the construction of the Levine Tanks for Replacing Transmission Main Valves, Installation of Interconnection between 300/180 Gradients, Structural Liner of Inlet Line to Reservoir, Pressure Relief.
-Three Change Orders as of 9/25/2024
|
Distribution |
5/11/2022 |
9/30/2025 |
$6,752,875.00 |
65% |
62% |
LSLRs following Test Pitting Operations in Main System |
LSLR Program for Main System |
Distribution |
5/11/2022 |
7/3/2025 |
$29,526,085.00 |
90% |
83% |
Emergency Water Main Repairs |
Conduct emergency repair services within distribution system.
-CO 1 to make emergency repairs to Kearny multiples for rehab of four (4) pipe crossings with Primus structural liner.
-CO2 to make emergency repairs on transmission mains
|
Distribution |
6/22/2022 |
12/31/2024 |
$7,158,513.00 |
100% |
88% |
Roadway Pavement Restoration |
Perform roadway pavement restoration following routine maintenance and emergency repairs performed by PVWC Operations. |
Distribution |
9/27/2023 |
9/26/2025 |
$4,499,300.00 |
On Call |
12%
|
Auditorium/Purification Stair Enclosure |
Rehab of Outside Staircase, HVAC, Lighting |
Plant |
2/7/2024 |
12/31/2024 |
$1,192,000.00 |
90% |
90% |
Furnish and Install Replacement Filter Media at the LFWTP |
Replacement of lost filter media in filter bays from overexpansion of filter bed during backwashing process. |
Plant |
3/12/2024 |
3/11/2025 |
$681,200.00 |
100% |
8% |
Concrete Restoration within Clifton, Passaic, Lodi, North Arlington and West Milford |
Concrete restoration work following distribution department activities. |
Distribution |
5/6/2024 |
5/5/2026 |
$495,000.00 |
On Call |
18% |
Concrete Restoration within Paterson and Prospect Park |
Concrete restoration work following distribution department activities. |
Distribution |
5/6/2024 |
5/5/2026 |
$495,000.00 |
On Call |
8% |
LFWTP Roof Rehabilitation |
This contract will perform repair/replacement of various roofs in addition to miscellaneous architectural repairs at various locations at the Little Falls Water Treatment Plant. |
Plant |
11/13/2024 |
11/13/2025 |
$1,193,600.00 |
10% |
0% |
Actiflo System Rehabilitation |
Replacement of Lamella Panels and structural supports in ActiFlo Clarification System. Adverise week of 7/22/24. |
Plant |
9/25/2024 |
9/25/2026 |
$2,300,000.00 |
1% |
0% |
Levine Reservoir Tanks |
Decommissioning of Levine Reservoir to build 2 new enclosed reservoirs (2.5MG tanks) in its place. |
Plant |
6/1/2025 |
3/30/2027 |
$41,819,780.00 |
0% |
0% |
Hydrocyclones |
Temporary removal and subsequent reinstallation of existing hydrocyclone units. New support structure and reconnection of all piping. |
Plant |
12/15/2021 |
11/12/2022 |
$227,000.00 |
100% |
89% |
Great Falls Buildings Rehab |
Historic rehabilitation of the Gate House and Pump House, two small one-story masonry buildings located in the Paterson Great Falls National Historic Park. |
Plant |
9/1/2023 |
10/1/2024 |
$2,124,400.00 |
100% |
91% |
Asbestos Remediation in MPS |
Abatement and disposal of 500 linear feet of abandoned 6-inch steam pipe with asbestos in the MPS basement at the LFWTP. |
Plant |
1/24/2024 |
7/24/2025 |
$158,525.00 |
100% |
0% |